Price spread is a trigger to investigate
When several contractors price the same written scope, a spread can still be normal. But as the gap grows, the odds increase that bids contain different assumptions, materials, exclusions, allowances, or timing.
After award, preserve the baseline
Once you select a contractor, keep the accepted contract amount and scope intact as the starting point in CheckMyRemodel.